Situation:

The district hospital in Vöcklabruck relocated to a new site on the so-called Schöndorfer Plateau, and it was the dry lining works employing tried-and-tested, economic products that turned out to be really impressive. After all, it is precisely such work in hospitals that represents a major challenge for contractors, particularly in sensitive operating theatres.

Challenges:

• More than 54,000 m² of plasterboard walls, 24,800 m² of independent wall linings, 8,000 m² of dry lining
• 2,000 m² of service duct casings (fire resistance class F90), 9,200 m² of plasterboard ceilings and 760 m² of mineral fibre ceilings were installed

Used Products

ARDEX A 828

Wall filling compound

ARDEX A 826

Wall smoothing compound

Please choose your region to see product offering in your Country
ARDEX GLOBAL

Solution:

ARDEX A 828 wall filling compound and ARDEX A 826 wall smoothing compound, both gypsum/synthetic-based products are ideal for finishing any type of plasterboard wall. And as time schedule and profitability are always crucial factors in major construction projects, knowledge of the facts is vital.

ARDEX A 828 can be applied in one operation, does not collapse, hardens continuously in any coat thickness and does not need to be sanded afterwards. ARDEX A 826 wall smoothing compound is the optimum choice for filling work, can be trowelled to a feather edge and exhibits excellent coverage. Now one thing is certain: With such a specification, the hospital in Vöcklabruck itself is fit and well for the future!

Other Projects

Children Hospital, Ho-Chi-Minh, Vietnam

AEON Mall, Vietnam

The Red Market, Macau, China

Porsche Workshop Tuen Mun and Chaiwan, Hong Kong, China

Kwai Tsing Theatre, Hong Kong, China

West Anaheim medical Center, Anaheim, CA, USA

Trolley Square Mall, Salt Lake City, Utah, USA

Hanscom Air Force Base, Bedford, MA, USA

The Ritz Carlton, Rancho Mirage, CA, USA

IKEA restaurant, Singapore

IKEA Guangzhou, China

The Line @ Tanjong Rhu