Product Capabilities:
Self-leveling underlayment for wood and distressed gypsum substrates
Benefits:
-
Use over plywood, OSB, and strip wood flooring as well as existing gypsum substrates prior to the installation of new floor covering
-
Install ceramic tile in 48 hours and other floor covering in 2-3 days
-
No metal lath required
-
Install from 1/4" to virtually any thickness; can be tapered to 1/16"
-
Needs no special curing
-
Use for interior, above grade floors only
-
Suitable for use with in-floor hydronic and electric radiant heating systems